Transactions of Nonferrous Metals Society of China The Chinese Journal of Nonferrous Metals

您目前所在的位置:首頁 - 期刊簡介 - 詳細(xì)頁面

中國有色金屬學(xué)報

ZHONGGUO YOUSEJINSHU XUEBAO

第31卷    第6期    總第267期    2021年6月

[PDF全文下載]        

    

文章編號:1004-0609(2021)-06-1686-08
分段膠結(jié)充填法非膠結(jié)充填體頂水高度的力學(xué)模型
張愛卿1, 2,吳愛祥2,王貽明2,王洪江2,尹升華2,王正英3

(1. 北華航天工業(yè)學(xué)院 建筑工程學(xué)院,廊坊 065000;
2. 北京科技大學(xué) 膏體充填采礦技術(shù)研究中心,北京 100083;
3. 山東能源臨沂礦業(yè)集團(tuán)有限責(zé)任公司 會寶嶺鐵礦,臨沂 277700
)

摘 要: 為了預(yù)防分段膠結(jié)充填過程中非膠結(jié)充填體頂水高度過大導(dǎo)致充填擋墻破壞而發(fā)生跑漿事故,在滿足一定假設(shè)條件和必要前提的基礎(chǔ)上,建立非膠結(jié)充填體頂水高度力學(xué)模型,并進(jìn)行理論求解。以某鐵礦充填采場為工程分析實(shí)例,采用控制變量法(CVM)研究非膠結(jié)充填體頂水高度隨充填沉降比和充填擋墻承受荷載的變化規(guī)律。結(jié)果表明:在充填擋墻承受荷載一定的前提下,非膠結(jié)充填體頂水高度隨著充填沉降比的增大而不斷增大,呈二次多項(xiàng)式關(guān)系;在充填沉降比一定的前提下,非膠結(jié)充填體頂水高度隨著充填擋墻承受荷載的增大而不斷增大,呈線性關(guān)系。最終得到某鐵礦充填采場非膠結(jié)充填體安全頂水高度值為2 m,與工程實(shí)測結(jié)果相同,研究具有一定的工程實(shí)用意義。

 

關(guān)鍵字: 非膠結(jié)充填體;頂水高度;充填擋墻;力學(xué)模型

Mechanical model of water head height of non-cemented backfill in sublevel stoping with cemented filling
ZHANG Ai-qing1, 2, WU Ai-xiang2, WANG Yi-ming2, WANG Hong-jiang2, YIN Sheng-hua2, WANG Zheng-ying3

1. College of Architectural Engineering, North China Institute of Aerospace Engineering, Langfang 065000, China;
2. Research Center of Paste Backfill and Mining, University of Science and Technology Beijing, Beijing 100083,China;
3. Huibaoling Iron Mine, Linyi, Shandong Energy Mining Croup Co., Ltd., Linyi 277700, China

Abstract:To prevent the height of non-cemented filling top water in sublevel stoping with cemented filling being too large to cause slurry overflowing and damage the filling blocking wall, the paper established a mechanical model of non-cemented filling top water height in sublevel stoping with cemented filling and solves it by using theory based on the assumption of elasticity. Taking iron ore for project, the paper applies CVM to study the variation of filling blocking wall carrying load under the conditions of different filling settlement ratio and top water height in whole tailings non cemented filling. The results show that under the premise of certain filling blocking wall height, filling slurry density and top water height, the bearing load of filling blocking wall increases with increase of the filling settlement ratio which is expressed by a quadratic polynomial equation. And under the premise of certain filling settlement ratio, the bearing load increases with the increasing of top water height which is expressed by a linear relationship. The terminal safety top water height of whole tailings non-cemented filling is 2 m in iron ore, which is the same with the result of engineering detection, and the research has some engineering practical significance.

 

Key words: non cemented filling; water head height; filling blocking wall; mechanical model

ISSN 1004-0609
CN 43-1238/TG
CODEN: ZYJXFK

ISSN 1003-6326
CN 43-1239/TG
CODEN: TNMCEW

主管:中國科學(xué)技術(shù)協(xié)會 主辦:中國有色金屬學(xué)會 承辦:中南大學(xué)
湘ICP備09001153號 版權(quán)所有:《中國有色金屬學(xué)報》編輯部
------------------------------------------------------------------------------------------
地 址:湖南省長沙市岳麓山中南大學(xué)內(nèi) 郵編:410083
電 話:0731-88876765,88877197,88830410   傳真:0731-88877197   電子郵箱:f_ysxb@163.com  
阿荣旗| 灵台县| 涟水县| 拜泉县| 大方县| 罗山县| 精河县| 抚顺县| 班戈县| 榆树市| 井冈山市| 银川市| 高平市| 浙江省| 凉城县| 商水县| 高安市| 铅山县| 金乡县| 莒南县| 新竹市| 六枝特区| 临夏县| 麻阳| 焉耆| 敖汉旗| 怀仁县| 洛川县| 阳朔县| 延津县| 麻城市| 明光市| 博野县| 建水县| 宜都市| 浦江县| 阿克陶县| 高台县| 渑池县| 来宾市| 汉寿县|