Transactions of Nonferrous Metals Society of China The Chinese Journal of Nonferrous Metals

您目前所在的位置:首頁 - 期刊簡介 - 詳細頁面

中國有色金屬學報

ZHONGGUO YOUSEJINSHU XUEBAO

第26卷    第1期    總第202期    2016年1月

[PDF全文下載]        

    

文章編號:1004-0609(2016)-01-0173-07
基于混合整數(shù)規(guī)劃法的采場回采順序優(yōu)化分析
王李管1, 2,任助理1, 2,潘傳鵬1, 2,陳 鑫1, 2

(1. 中南大學 資源與安全工程學院,長沙 410083;
2. 中南大學 數(shù)字礦山研究中心,長沙 410083
)

摘 要: 針對地下礦山傳統(tǒng)編制生產(chǎn)計劃時存在的隨意性大、效率低、不能編制出最優(yōu)生產(chǎn)計劃的弊端,提出運用混合整數(shù)規(guī)劃法解決采場回采順序優(yōu)化問題的方法。對無底柱分段崩落法的采場回采順序進行科學系統(tǒng)的分析,以計劃周期內(nèi)貼現(xiàn)值最大化為目標函數(shù),綜合考慮邏輯、設備數(shù)量、空間順序等約束條件,構(gòu)建采場回采順序優(yōu)化的混合整數(shù)規(guī)劃模型;在MATLAB環(huán)境下采用YALMIP編寫模型語言并調(diào)用CPLEX求解器進行求解,進而得到采場回采順序的最優(yōu)布置方案。結(jié)果表明:此方法科學可行,克服傳統(tǒng)手工方法編制生產(chǎn)計劃的弊端,實現(xiàn)資源合理高效開采,對指導礦山的實際生產(chǎn)有重要的意義。

 

關(guān)鍵字: 無底柱分段崩落法;采場回采順序;混合整數(shù)規(guī)劃;生產(chǎn)計劃

Optimization analysis of stope mining sequence based on mixed integer programming
WANG Li-guan1, 2, REN Zhu-li1, 2, PAN Chuan-peng1, 2, CHEN Xin1, 2

1.School of Resources and Safety Engineering, Central South University, Changsha 410083, China;
2. Center of Digital Mine Research, Central South University, Changsha 410083, China

Abstract:The traditional analysis process of production schedule is random, inefficient, and the optimal production scheduling can not be arranged. The mixed integer programming method was proposed to solve the stope mining sequence optimization problem. The amount of machinery and equipment, vertical and horizontal mine-sequencing were taken as constraints, the net present value (NPV) was used as objective function of mathematical programming model, the stope mining sequence optimization model was scenically analyzed and built based on mixed integer programming method. It was solved with CPLEX, MATLAB and YALMIP for a certain Chinese iron mine. Finally, the optimal arrangement scheme of stope mining sequence was obtained. The results show that this model is scientific and feasible, and the production schedule saves costs compared to schedules manually by meeting desired production quantities more closely and reducing employee time spent on preparing schedules. It has an important significance to guide the actual production of the mine.

 

Key words: sublevel caving method; mining sequence optimization; mixed integer programming; production scheduling

ISSN 1004-0609
CN 43-1238/TG
CODEN: ZYJXFK

ISSN 1003-6326
CN 43-1239/TG
CODEN: TNMCEW

主管:中國科學技術(shù)協(xié)會 主辦:中國有色金屬學會 承辦:中南大學
湘ICP備09001153號 版權(quán)所有:《中國有色金屬學報》編輯部
------------------------------------------------------------------------------------------
地 址:湖南省長沙市岳麓山中南大學內(nèi) 郵編:410083
電 話:0731-88876765,88877197,88830410   傳真:0731-88877197   電子郵箱:f_ysxb@163.com  
普宁市| 兴化市| 鄂托克旗| 澄迈县| 噶尔县| 互助| 和顺县| 泾阳县| 莱西市| 耿马| 盐边县| 绥棱县| 冕宁县| 明溪县| 盐边县| 哈密市| 泗水县| 嘉义县| 嘉善县| 武隆县| 武山县| 上高县| 灵山县| 广宗县| 双城市| 白城市| 肥城市| 兖州市| 西乌珠穆沁旗| 和政县| 沂南县| 五台县| 武汉市| 三原县| 德江县| 巫溪县| 上犹县| 荥阳市| 黄山市| 行唐县| 兴仁县|