(1.同濟大學 地下建筑與工程系, 上海 200092;
2.中南大學 資源環(huán)境與建筑工程學院, 長沙 410083)
摘 要: 以某銅金屬礦山為例,簡介無間柱連續(xù)采礦法的技術思路和具體方案。運用能模擬開挖與充填的三維有限單元法程序,對無間柱連續(xù)采礦法礦段回采的實際采礦過程進行數(shù)值分析,得出了無間柱連續(xù)采礦法的地壓活動規(guī)律,提出相應的地壓控制措施,為無間柱連續(xù)采礦法在試驗礦山的應用和推廣提供了依據(jù)。
關鍵字: 金屬礦山; 無間柱連續(xù)采礦法; 地壓; 數(shù)值模擬
non-pillar continuous mining method
(1.Department of Geotechnical Engineering,
Tongji University, Shanghai 200092, P.R.China;
2. College of Resource, Environment and Civil Engineering,
Central South University, Changsha 410083, P.R.China)
Abstract: There is a general tendency to use continuous mining in underground metal mine. Non-pillar continuous mining(NPCM) was briefly introduced as an example of a new continuous mining method in a copper mine. Its technological concept and its excavation plan were outlined. Three-dimensional finite element numerical method was employed to simulate the practical excavation and backfilling mining activities. Stability status (including stress and displacement) was analyzed and proper measures to control the ground pressure were presented. These measures are as follows: 1) attention to manage the stope's roof should be focused on the roof near the hanging wall;2) the strength and stiffness of backfilling in the lower part of stope should be greater than that of backfilling in the upper part;3) there exists localized stress concentration in the temporary pillar and temporary ore-wall during the whole process of excavation;4) control blast technique should be employed to excavate the temporary ore-wall and the ore body near the temporary ore-wall.
Key words: metal mine; non-pillar continuous mining(NPCM); numerical simulation